Machines that keep working and report what they did

A line that runs without manual steps in between, and from the office you see what was produced and when it stood still.

Schedule a free intake

An operator presses the start button, waits for the filling machine to finish, walks to the labeler, and presses start again there. At the end of the day, someone counts the pallets and types the number into a spreadsheet. If the line stood still for an hour, nobody remembers exactly why the next morning. That is how many production lines in the Netherlands run: the machines are good, but the steps between them are manual work.

Start with the real production sequence

Most downtime is not in broken machines but in the handoffs. A machine waits for an operator who is busy somewhere else. A batch runs on because nobody saw the temperature getting too high. A changeover takes half an hour because the settings hang on a piece of paper next to the machine. Each of those moments costs a few minutes, and at the end of the week that is a day.

We first look at where that happens. We walk a shift, talk to the people on the line, and write down where someone steps in because the installation cannot do it itself. That is the list we go to work with, not the wish list of the machine vendor.

Controls operators can understand

In practice, industrial automation means a PLC takes over the steps that people now string together. Sensors report that a product is ready, the controls start the next machine, and when something is off, the line stops in a controlled way instead of an hour of downtime. We program that PLC, design the operator screen, and make sure the schematic and the I/O list match what is really in the cabinet. We write the code so your own maintenance team can read and change it.

If you already have a PLC brand in house, we work with it. If there are machines that are mechanically good for years but have controls nobody makes parts for anymore, we pick that up through Machine retrofit. And if a robot arm has to go between two stations, that is Robotics integration, with the same controls as the base.

Commission with a controlled stop

A factory cannot stand still for two weeks because we are programming. That is why we first rebuild the program on a test setup, with the same PLC and a simulation of the sensors and drives. There we run through every step, including the awkward ones: what happens when a sensor fails, when someone hits the emergency stop, when the power drops for a moment. Within ten business days, we show on that setup how your line will respond, so your operators can look along before anything changes in the factory.

Only when that is right do we come to the floor. We plan the switchover for a moment the line is down anyway, such as a weekend or a changeover. Your old way of working stays available until the new one has proven it can handle the work. If you then want it in writing that the cycle times and the temperature curve are right, we bring in automated test systems for that.

Connect the line without exposing control

A PLC knows exactly how many products went by, how long the line stood still, and why. That information usually stays in the cabinet. We get it out. The controls report counts, downtime, and faults to your ERP or planning system, so the retyping at the end of the day disappears and the production manager sees the next morning what happened. If you want overviews of that across weeks and months, it connects to Data and reporting. The data goes to a server in the EU or simply stays on your own network.

The program, the schematic, and the documentation are yours. We deliver a backup of everything and show your maintenance team how to make a change themselves. If the first conversation shows that your problem is solved with an extra sensor and a timer relay, we tell you right away and build nothing bigger.

01, RESULT

A PLC program with readable, documented code
An operator screen your operators understand without a manual
An electrical schematic and I/O list of the installation
An integration between the controls and your office software
A backup of the program and instructions for your maintenance team

Process diagram

Process diagramProcess diagram: Operator runs every step by hand → Downtime without an explanation → PLC controls with an integration. Bottleneck: Downtime without an explanation. Optimized: Line runs and reports itself.MREVIEWOperator runs everystep by handBOTTLENECKDowntime without anexplanationPLC controls with anintegrationLine runs and reportsitselfProcess diagramProcess diagram: Operator runs every step by hand → Downtime without an explanation → PLC controls with an integration. Bottleneck: Downtime without an explanation. Optimized: Line runs and reports itself.MREVIEWOperator runs every step byhandBOTTLENECKDowntime without anexplanationLine runs and reports itselfPLC controls with anintegration

02, HOW WE WORK

  1. We walk a shift along the line and note where an operator has to step in today.

  2. We draw out the controls

    which sensors, which drives, which PLC, and which operator screen.

  3. We program the PLC and the screen and test everything first on a test setup with the same parts.

  4. You run a trial with real products while the old way of working stays in place next to the new one.

  5. We connect the controls to your ERP or planning, so the production figures reach the office by themselves.

FAQ

FAQ

Which PLC brand do you use?

The brand your maintenance team already knows, if there is one. If nothing is in place yet, we choose a common brand for which parts and technicians are easy to find in the Netherlands. The program is yours and is not locked up with us.

Our machines are twenty years old. Does everything have to be replaced?

Usually not. A machine that is mechanically still fine gets new controls or an extra sensor and runs for years more. That is exactly what we do in Machine retrofit, and if replacing turns out cheaper after all, we tell you right away.

Can the line keep running during the conversion?

Largely. We build and test the program first on a test setup and switch over the new controls during a planned stop, for example on a weekend. Your old way of working stays available until the new one has proven it can handle the work.

Schedule a free intake.

Schedule a free intake

Open contact menu

Carlos Kroon Optimi

Good afternoon 👋

How can I help?

Mon–Fri, 9:00 AM–6:00 PM · We usually respond within one hour on business days.